Titanium Energy Services

Well Intervention

Titanium Energy Services supports a full range of Coil Tubing, Electric Coil, Wireline, Nitrogen Purging & Fluid Pumping solutions. Our upstream solutions specialize in tool deployment, data acquisition well intervention projects & water treatment technology.

Titanium
Well Intervention

Coiled Tubing (CT) is a continuous length of slender steel pipe, typically ranging from 1 to 3.25 inches (25 to 83 mm) in diameter, wound on a substantial reel. Alongside surface equipment, it encompasses various techniques for drilling, completion, workover, or remediation in the oilfield. Originally designed for live, producing wells, Titanium’s Coiled Tubing oilfield technology has evolved to become a versatile solution for well interventions. Its applications extend to operations in oil and gas wells, and in some instances, it serves as production tubing in depleted gas wells. Coiled tubing provides a flexible and efficient alternative to wireline operations, offering a broader range of options and increased flexibility in the field.

Service Capabilities

Nearly 200 people work for Titanium Energy Services in coil tubing operations, 80 of whom have more than five years’ experience. The company is capable of researching and developing advanced coil tubing technology, developing downhole tools, preparing designs, and conducting on-site operations. The company offers a full set of coil tubing engineering services and has applied special technology in Canada

Feature

-Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore. -Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat.

Feature

-Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore. -Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat.

Feature

-Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore. -Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat.

Feature

-Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore. -Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat.

Feature

-Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore. -Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat.

Feature

-Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore. -Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat.

Well Intervention

Titanium Energy Services provides reliable quality services with innovative tools and equipment for effective results.

Acid Stimulation/Acidizing

Acid can be pumped down the coiled tubing to stimulate the formation.

Milling

running coiled tubing into the wellbore with milling/drilling bottom hole tools (BHA) to remove bridge plugs, fac ports, cement, or casing deformations

Enhanced Oil Recovery

N2 injected into the formation to increase reservoir pressure and help the production

High-Rate Fluid Pumping

high-rate, high-volume pressure trucks that are capable of up to 10,000 psi. and pump rates up to 1m3/min.

Well Stimulation

injecting pressurized fluids to improve productivity with enhanced fluid pumping, include hydraulic fracturing (fracking) and acidizing allowing better fluid flow

Nitrified Wellbore Freezing

involves the controlled application of liquid nitrogen to create a frozen barrier within the wellbore. This process is highly effective for various applications including wellbore isolation, controlling unwanted fluid influx, facilitating well interventions.

Set & Unsetting Downhole Tools

running coiled tubing into the wellbore for setting and/or retrieving bride plugs, packers etc… to isolate portions of the wellbore

Casing Patch

running coiled tubing into the wellbore to install Casing Patches into problematic wellbore with damaged casing

Downhole Tool Deployment

operating, setting and retrieving specialty tools

Chemical Cuts

initiation chemical reaction with an electric signal or a or mechanical action

Well Kick-off

pumping nitrogen to decrease hydrostatic pressure of fluid column in older wells to allow the well to start producing again

Hydrate Removal

running coiled tubing into the wellbore to pump Hot Water and/or Methanol blends used to remove hydrate from the wellbore

Fishing

running coiled tubing into the wellbore to retrieve lost tools from the well

Abrasive Jetting

to create perforations in the casing before frac. Abrasive jetting is usually used to create additional perforations on older wells during the re-fracturing operations or to add additional zones when shifting sleeves malfunction.

Wellbore Clean-Outs Services

E-Coil (Electric Coiled Tubing) provides reliable safe method in reducing operating cost in horizontal applications with the versatility of conventional wireline and the rigidity of coil tubing. With expanding demand for E-Coil and the ever-growing market to provide high quality solutions for horizontal applications, Titanium Energy Services expertise delivers the results the industry requires.

Titanium Worker controlling well intervention machine